Suggested Searches

The Friendship 7 Mission Patch has the words Mercury 6, Friendship 7, and Glenn on it. It shows an image of the Earth from space with an orbital path drawn on it.

Mercury-Atlas 6: Friendship 7

Occurred 63 years ago

An Atlas launch vehicle propelled a Mercury spacecraft into Earth orbit and enabled astronaut John Glenn to circle Earth three times. The flight lasted a total of 4 hours, 55 minutes, and 23 seconds before the Friendship 7 spacecraft splashed down in the ocean.

Mission Type

Crewed orbital space flight

crew

John H. Glenn

Launch

Feb. 20, 1962

Landing

Feb. 20, 1962

Mission Facts

Mission: FRIENDSHIP-7
Launch Pad: LC-14
Vehicle: Atlas (6)
Crew: John H. Glenn, Jr.
Payload: Spacecraft No. 13, Launch Vehicle Number 109-D

Milestones

August 27, 1961 – Capsule arrived at Cape Canaveral Air Force Station, Florida
February 15, 1962 – Flight safety review
February 20, 1962 – Launch

Mission Objective

Place a man into Earth orbit, observe his reactions to the space environment and safely return him to Earth to a point where he could be readily found. The Mercury flight plan during the first orbit was to maintain optimum spacecraft attitude for radar tracking and communication checks.

Orbit

Altitude: 162.2 x 100 statute miles
Inclination: 32.54
Orbits: 3
Period: 88 minutes, 29 seconds
Duration: 0 Days, 4 hours, 55 min, 23 seconds
Distance: 75,679 statute miles
Velocity: 17,544 miles per hour
Max Q: 982 psf
Max G: 7.7

Launch

February 20, 1962. 9:47:39 am EST. Cape Canaveral Launch Complex 14. Powered flight lasted 5 minutes 1 second and was completed normally.

The Mercury countdown began on January 27, 1962 and was performed in two parts. Precount checks out the primary spacecraft systems, followed by a 17.5 hour hold for pyrotechnic checks, electrical connections and peroxide system servicing. Then the countdown began. The launch countdown proceeded to the T-13 minute mark and then was canceled due to adverse weather conditions. After cancellation, the mission team decided to replace the carbon dioxide absorber unit and the peroxide system had to be drained and flushed to prevent corrosion. Launch vehicle systems were then revalidated and a leak was discovered in the inner bulkhead of the fuel tank that required 4-6 days to repair. The launch was rescheduled to February 13, 1962 and then to February 14, 1962 for all the bulkhead work to complete. The precount picked up again on February 14, 1962, February 15, 1962 and February 16, 1962 but was canceled each time due to adverse weather. The launch was then rescheduled for February 20, 1962.

Black and white image of NASA astronaut John Glenn departs the crew quarters at Cape Canaveral Air Force Station's Hangar S. as men watch
NASA astronaut John Glenn departs the crew quarters at Cape Canaveral Air Force Station’s Hangar S.
NASA

During the launch countdown on February 20, 1962, all systems were energized and final overall checks were made. The count started at T-390 minutes by installing and connecting the escape-rocket igniter. The service structure was then cleared and the spacecraft was powered to verify no inadvertent pyrotechnic ignition. The personnel then returned to the service structure to prepare for static firing of the reaction control system at T-250 minutes. The spacecraft was then prepared for boarding at T-120 minutes. The hatch was put into place at T-90 minutes. During installation a bolt was broken, and the hatch had to be removed to replace the bolt causing a 40 minute hold. From T-90 to T-55 final mechanical work and spacecraft checks were made and the service structure was evacuated and moved away from the launch vehicle. At T-45 minutes, a 15 minute hold was required to add fuel to the launch vehicle and at T-22 minutes an additional 25 minutes was required for filling the liquid-oxygen tanks as a result of a minor malfunction in the ground support equipment used to pump liquid oxygen into the launch vehicle. At approximately T-35 minutes, filling of the liquid-oxygen tanks began and final spacecraft and launch vehicle systems checks were started.

At T-10 minutes the spacecraft went on internal power. At T-6 minutes 30 seconds, a 2 minute hold was required to make a quick check of the network computer at Bermuda. The launch vehicle went on internal power at T-3 minutes. At T-35 seconds the spacecraft umbilical was ejected and at T-0 the main engines started. Liftoff occurred at T+4 seconds at 9:47:39 a.m. EST.

Landing

Date: February 20, 1962, 14:43:02 a.m. EST
Location: 800 miles southeast of Bermuda
Details: Recovered by the destroyer USS Noa. Lookouts on the destroyer sighted the main parachute at an altitude of 5,000 feet from a range of 5 nautical miles. The Noa had the spacecraft aboard 21 minutes after landing and astronaut John Glenn remained in the spacecraft during pickup. Original plans had called for egress through the top hatch but Glenn was becoming uncomfortably warm and it was decided to exit by the easier egress path.

Mission Highlights

The mission was successful. The first American in orbit. Total time weightless was 4 hours, 48 minutes, 27 seconds.

During the flight only two major problems were encountered: (1) a yaw attitude control jet apparently clogged at the end of the first orbit, forcing the astronaut to abandon the automatic control system for the manual-electrical fly-by-wire system; and (2) a faulty switch in the heat shield circuit indicated that the clamp holding the shield had been prematurely released—a signal later found to be false. During reentry, however, the retropack was not jettisoned but retained as a safety measure to hold the heat shield in place in the event it had loosened.

60 Years Ago: John Glenn, the First American to Orbit the Earth

In February 1962, the space race between the United States and the Soviet Union was in full swing…

Read the Story about 60 Years Ago: John Glenn, the First American to Orbit the Earth
Close up John Glenn on board the Friendship 7 spacecraft
Keep Exploring

Discover More Topics From NASA's History