![](https://images-assets.nasa.gov/image/AFRC2018-0212-099/AFRC2018-0212-099~large.jpg?w=1920&h=1281&fit=clip&crop=faces%2Cfocalpoint)
Armstrong X-57 team brief NASA Administrator Bridenstine about the progress of making a combustion aircraft into an all-electric airplane. X-57 is in Scaled Composites hangar at Mojave Air & Space Port in California. Model of the final aircraft design sta
Administrator Bridenstine hears about the progress to modify the Tecnam P2006T from a combustion aircraft to an all-electric aircraft. Armstrong's X-57 team and ESAero, the prime contractor for the plane, are doing the briefing. The final configuration model of X-57 stands in front of group.
Image Credit: NASA/Ken Ulbrich
- X
https://www.nasa.gov/image-detail/amf-afrc2018-0212-099/
TakenAugust 28, 2018
ProducerAFRC
Image CreditNASA/Ken Ulbrich
Size1920x1281px
PIA NumberAFRC2018-0212-099