NASA conducts the final RS-25 hot fire test of an initial certification series on the Fred Haise Test Stand at NASA Stennis on June 22. The series featured almost 110 minutes of cumulative hot fire duration, including four long-duration tests, an aggressive gimbal test, and a wide range of performance objectives.