Suggested Searches

1 min read

Preparing Juno for Acoustical Testing

Preparing Juno for Acoustical Testing
Technicians lift NASA's Juno spacecraft onto a dolly prior to the start of a round of acoustical testing. During acoustical testing a spacecraft is subjected to conditions that simulate the intense vibrations of launch and other less intense operations that take place while in flight.

Technicians lift NASA’s Juno spacecraft onto a dolly prior to the start of a round of acoustical testing. During acoustical testing a spacecraft is subjected to conditions that simulate the intense vibrations of launch and other less intense operations that take place while in flight. In this instance, the dolly provides the necessary ground clearance to perform a functional test of Juno’s main engine cover.
This image was taken on Sept. 30, 2010, in the Reverberant Acoustics Lab at Lockheed Martin Space Systems in Denver, during Juno’s assembly process.
The Jet Propulsion Laboratory, a division of the California Institute of Technology, Pasadena, manages the Juno mission for NASA’s Science Mission Directorate. Scott Bolton of Southwest Research Institute, San Antonio, is the principal investigator. Lockheed Martin Space Systems is building the spacecraft. The Italian Space Agency, Rome, is contributing an infrared spectrometer instrument and a portion of the radio science experiment.
For more information about Juno visit https://www.nasa.gov/juno.Image Credit: NASA/JPL-Caltech/LMSS