Suggested Searches

1 min read

Hybrid-Electric Integrated Systems Testbed

HEIST’s modified wing is lifted into position after being mounted on a big rig.
HEIST’s modified wing is lifted into position after being mounted on a big rig prior to tests on the Rogers Dry Lake Bed in Edwards, CA

ED15-0081-086

HEIST’s modified wing is lifted into position after being mounted on a big rig prior to tests on the Rogers Dry Lake Bed in Edwards, CA

March 23, 2015
NASA Photo / Tom Tschida