Matt Ashmore, an engineer at NASA’s Goddard Space Flight Center in Greenbelt, Maryland, performs a fit check of RRM3’s three external tools (from left to right: cryogen servicing tool, VIPIR2, multi-function tool 2). After RRM3 is installed to the outside of International Space Station the Dextre robotic arm will mount the pedestal and tools, pre-assembled by astronauts on the space station.
1 min read