Report of the PRESIDENTIAL COMMISSION
on the Space Shuttle Challenger Accident
Volume 4 Index
Hearings of the Presidential
Commission on the Space Shuttle Challenger Accident: February 6, 1986
to February 25, 1986
FEBRUARY 14, 1986 SESSION
[665] [Ref. 2/14-6] PRIMARY CONCERNS.
PRIMARY CONCERNS
- FIELD JOINT - HIGHES CONCERN
- EROSION PENETRATION OF PRIMARY SEAL REQUIRES RELIABLE
SECONDARY SEAL FOR PRESSURE INTEGRITY
- IGNITION TRANSIENT - (0-600 MS)
- (0-700 MS) HIGH PROBABILITY OF RELIABLE SECONDARY SEAL
- (170-330 MS) REDUCED PROBABILITY OR RELIABLE SECONDARY
SEAL
- (330-600 MS) HIGH PROBABILITY OF NO SECONDARY SEAL
CAPABILITY
- STEADY STATE - (600 MS - 2 MINUTES)
- IF EROSION PENETRATES PRIMARY O-RING SEAL - HIGH
PROBABILITY OF NO SECONDARY SEAL CAPABILITY
- BENCH TESTING SHOWED O-RING NOT CAPABLE OF MAINTAINING
CONTACT WITH METAL PARTS GAP OPENING RATE TO MEOP
- BENCH TESTING SHOWED CAPABILITY TO MAINTAIN O-RING
CONTACT DURING INITIAL PHASE (0-170 MS) OF TRANSIENT
Back