Report of the PRESIDENTIAL COMMISSION
on the Space Shuttle Challenger Accident
Volume 4 Index
Hearings of the Presidential
Commission on the Space Shuttle Challenger Accident: February 6, 1986
to February 25, 1986
FEBRUARY 10, 1986 SESSION
[316] [Ref.
2/10-15]
QM-5 Options
- Putty options
- Randolph putty, asbestos-filled.
presently flight qualified
- Inmont-Canada putty, asbestos-filled,
tested on DM-7 aft field joint and nozzle-to-case joint
- Inmont-St. Louis putty, asbestos-free,
tested on DM-7 center field joint
- QM-5 approach and rationale
- Randolph putty in igniter joints
- Presently installed
- Previous tests and flights verify
acceptability
- Other putty may be used later based
on similarity to use in nozzle joint
- Inmont-Canada asbestos-filled putty in
field and nozzle joints
- Qualify alternate material as being
equivalent or superior to Randolph putty while introducting
least risk to firing
- Field joint layup per DM-7 aft and
center joint configuration based on known joint gaps
- Nozzle joint layup same as current
flight configuration