EXTERNAL TANK | |
---|---|
| |
MAJOR DESIGN REQUIREMENTS | |
| |
STRUCTURAL | |
3 SIGMA LOADS AS DEFINED IN LOADS DATA BOOK |
TEST TO 1.25/1.4 TIMES MAXIMUM SPECIFIED LOADS |
|
AT LH2 TEMPERATURE FOR LH2 TANK AND ROOM TEMPERATURE FOR LO2 TANK AND INTERTANK |
| |
PROPULSION | |
MAINTAIN AND DELIVER PROPELLANTS TO MEET ORBITER/SSME INTERFACE REQUIREMENTS |
QUALIFY BY TEST TO REQUIREMENTS |
|
MAIN PROPULSION TESTS |
| |
THERMAL PROTECTION SYSTEM | |
MAINTAIN PROPELLANT QUALITY |
QUALIFY BY TEST (WIND TUNNEL, COMBINED ENVIRONMENT, PLASMA ARC, ETC.) TO SPECIFIED ENVIRONMENT |
THERMALLY PROTECT STRUCTURE FROM ASCENT AND PLUME INDUCED HEATING | |
LIMIT ICE FORMATION TO AVOID DAMAGING ORBITER | |
| |
|