Appendix
E
|
Independent Test Team Report to
the Commission.
|
Appendix
F
|
Personal Observations on
Reliability of Shuttle.
|
Appendix
G
|
Human Factors Analysis.
|
Appendix
H
|
Flight Readiness Review Treatment
of O-ring Problems.
- STS-6 Flight Readiness
Reviews: Charts 1 & 2.
- STS 41-C Flight Readiness
Reviews. Charts 3-21A.
- STS 41-D Flight Readiness
Reviews: Charts 22-28.
- STS 41-G Flight Readiness
Reviews: Charts 29-32.
- STS 51-E Flight Readiness
Reviews: Charts 33-81, Transcript.
- STS 51-B Flight Readiness
Reviews: Charts 82-84.
- STS 51-F Flight Readiness
Reviews: Charts 85-133.
- August 19, 1985 Thiokol
Briefing to NASA Headquarters: Charts 134-189.
- STS 51-J Flight Readiness
Reviews: Chart 190.
- STS 61-C Flight Readiness
Reviews: Chart 191.
|
Appendix
I
|
- NASA Pre-Launch Activities
Team Report.
-
- I. Table of Contents.
- II. Signature Page.
- III. Summary Narrative.
- IV. Charter.
- V. Organization.
- VI. Definitions of Terms and
Acronyms.
- VII. Technical Description and
Analysis.
- A. NSTS Processing.
- 1. SRB Processing Review
Study.
- 2. SRB Joint Mate Review
Team Study.
- 3. ET Processing Review
Study.
- 4. Orbiter Processing
Review Study.
- 5. Pad-B Activation
Review Study.
- 6. Pad-B Facility Review
Study.
- 7. Ice Team
Report.
- 8. Payload Processing
Review Study.
- 9. Integrated Ground
Processing Review Study.
- 10. Range Support Review
Study.
- B. Flight Readiness Review
Process.
- 1. Flight Readiness
Review Process Study.
- C. Pre-Launch
Security.
- 1. Assessment of Kennedy
Space Center Security Procedures and Operations
Supporting STS 51-L Mission.
- VIII. Findings and
Conclusions.
|
Appendix
J
|
NASA Mission Planning and
Operations Team Report.
- I. NARRATIVE SUMMARY.
- II. GENERAL ASSIGNMENT
LETTER.
- III. ORGANIZATION/METHOD OF
INVESTIGATION.
- IV. ACRONYMS.
- V. MISSION PLANNING AND
OPERATIONS TEAM REPORT.
- A. STS 51-L Planning and
Preparations.
- B. STS 51-L Mission
Operations.
- C. Mission Planning.
- D. National Space
Transportation System (NSTS) Mission
Operations.
- E. NSTS Flight Rate and
Flight Scheduling.
- VI. MAJOR FINDINGS AND
CONCLUSIONS.
- VII. REFERENCES.
-
- APPENDIX A. RANGE SAFETY
REPORT (Not Reproduced).
- APPENDIX B. KSC LANDING
CONSIDERATION REPORT. (Not Reproduced).
- APPENDIX C. CREW ESCAPE
SYSTEMS REPORT. (Not Reproduced).
- APPENDIX D. ORBITER
MAINTENANCE/INSPECTION SYSTEMS SUMMARY. (Not
Reproduced).
- APPENDIX E. EXECUTIVE SUMMARY
OF FLIGHT SOFTWARE REVIEW BRIEFING TO THE PRESIDENTIAL
COMMISSION. (Not Reproduced).
- APPENDIX F. FLIGHT CREW
INVOLVEMENT IN THE SPACE SHUTTLE PROGRAM. (Not
Reproduced).
- APPENDIX G. STS 51-L FLIGHT
OPERATIONS TEAM SUMMARY REPORT. (Not
Reproduced).
|
Appendix
K
|
NASA Development and Production
Team Report.
- I. SUMMARY NARRATIVE.
- II. DIRECTIVE APPOINTING
DEVELOPMENT AND PRODUCTION TEAM/CHARTER.
- III. ORGANIZATION/METHOD OF
INVESTIGATION.
- IV. DEFINITIONS OF TERMS AND
ACRONYMS.
- VI. FINDINGS AND
CONCLUSIONS.
-
- APPENDICES (Not
Reproduced)
-
- A. DDATF Charter/D&P Team
General Assignment.
- B. Space Shuttle Solid Rocket
Booster Fact Book.
- C. SRM Design and Development
Requirements and Certification.
- D. Space Shuttle Solid Rocket
Motor Chronology.
- E. Hazard Analysis Report for
Space Shuttle Solid Rocket Booster and Range Safety
Command Destruction System.
- F. SRM Action Items.
- G. Solid Rocket Booster Design
Verification.
- H. MSFC Presentation.
- I. Martin Marietta Corporation
Presentation to the Presidential Commission.
- J. ET System Definition
Handbook.
- K. ET Hazard Catalog.
- L. ET Action Items.
- M. SSME Description and
Operation.
- N. Rocketdyne Presentation to
the Presidential Commission.
- O. Detail Design Hazard
Analysis Space Shuttle Main Engine Operational
Flights.
- P. SSME Action Items.
- Q. Space Shuttle Sytem
Summary.
- R. Rockwell International
Presentation to the Presidential Commission.
- S. Space Transportation System
Mission Safety Summary.
- T. Orbiter Action
Items.
- U. SRM O-ring Anomaly
Chronology.
-
|
Appendix
L
|
NASA Accident Analysis Team
Report.
- 1. Introduction.
- 2. Accident Timeline.
- 3. Anomalies/Significant
Observations.
- 4. Areas of
Consideration.
- 5. SRB/SRM
Possibilities.
- 6. Joint/Seal
Possibilities.
- 7. Findings.
- 8. Appendix A.
-
- STS 51-L
DATA & DESIGN ANALYSIS TASK FORCE ACCIDENT
ANALYSIS TEAM SOLID ROCKET MOTOR WORKING
GROUP:
- I.
Organization/Responsibilities
- II. Method of
Investigation
- III. Definition of Terms and
Acronyms
- IV. Technical
Description
- A. Hot Gas Leak Failure
Scenarios
- 1. Internal
Heating/Inhibitor/Insulation Anomalies.
- a. Scenario
Description
- b.
Investigation
- c. Findings
- 2. LH2
Leak Resulting in SRM Case Membrane orJoint
Failure .
- 3. Assembly
Conditions/Anomalies
- a. Scenario
Description
- b.
Investigation
- c. Findings
- 4. Scenario 4: Primary
O-Ring Blow-by or Low Temperature
Effects.
- a. Scenario 4a:
Secondary O-Ring Defect
- b. Scenario 4b: Ice
in Joint
- c. Scenario 4c: Leak
Check Port Leaks
- d. Scenario 4d:
O-Ring Actuation Time Delayed by Low
Temperature
- 5. Loads
Exceedance
- 6. Scenario 6: Putty
Holds Pressure Off Primary O-Ring
- 7. Case Rupture .
- B. Linear Shaped Charge
Failure (Motor)
- C. Linear Shaped Charge
Failure (Nozzle)
- D. Propellant Detonation
(External Shock Wave)
- E. Safe and Arm Device
Failure
- F. Igniter Failure
- G. Flex Bearing
Failure
- H. System Tunnel Failure
- I. Propellant/Liner Debound
Failure
- J. Insulation Failure
- K. Nozzle Failure
- L. Pressure Transducer/Port
Failure
- M. Propellant Grain Failure
- N. Combustion Instability
- O. External Thermal
Protection System Failure
- P. Electrostatic Discharge
- V. Summary
- VI. Findings
-
- APPENDIX
A. Recovery Support
Team Report.
- APPENDIX
B. SRM Team
Analyses.
- APPENDIX
C. SRM Team
Tests.
-
|
Appendix
M
|
Comments by Morton Thiokol on NASA
Report.
|