Journal Home Page | Apollo 15 Journal |
This Flight Plan excerpt was scanned by Frank O'Brien.
The Full Flight Plan is also available as part of the Apollo 15 Flight Journal by David Woods and Frank O'Brien.
Page 5-10, 108:00-120:00, Summary Flight Plan (113k; jpg)
Page 5-11, 120:00-132:00, Summary Flight Plan (116k; jpg)
Page 5-12, 132:00-144:00, Summary Flight Plan (97k; jpg)
Page 5-13, 144:00-156:00, Summary Flight Plan (109k; jpg)
Page 5-14, 156:00-168:00, Summary Flight Plan (100k; jpg)
Page 5-15, 168:00-180:00, Summary Flight Plan (121k; jpg)
Page 3-106, 97:00-98:00, IVT to LM, LM Activation (56k; jpg)
Page 3-108, 98:00-99:00, LM systems activation, IMU coarse align (113k; jpg)
Page 3-110, 99:00-100:00, IMU realign, RCS, ECS Checkout (83k; jpg)
Page 3-112, 100:00-100:30, Undocking and separation (81k; jpg)
Page 3-114, 100:30-101:00, DPS throttle check, Landing site observations (75k; jpg)
Page 3-116, 101:00-101:30, IMU realign, AGS initialization (72k; jpg)
Page 3-118, 101:30-102:00, P76 Rendezvous radar checkout, AGS calibration (51k; jpg)
Page 3-120, 102:00-102:30, DPS pressurization and checkout, landing radar checkout (72k; jpg)
Page 3-122, 102:30-103:00, Landing site photography, IMU realign (62k; jpg)
Page 3-124, 103:00-104:00, Final PDI checkout (71k; jpg)
Page 3-126, 104:00-105:00, PDI, touchdown, system checks for stay/no stay (110k; jpg)
Page 3-128, 105:00-106:00, IMU realign (3), power down, configure for stand-up EVA@ (105k; jpg)
Page 3-130, 106:00-106:30, Cabin depress, Stand-up EVA: photography (71k; jpg)
Page 3-132, 106:30-107:00, Stand-up EVA: geology descriptions, repressurization (67k; jpg)
Page 3-134, 107:00-108:00, Post SEVA suit doffing, eat period (65k; jpg)
Page 3-136, 108:00-109:00, Eat period, pre-sleep activities (62k; jpg)
Page 3-138, 109:00-110:00, Rest period (49k; jpg)
Page 3-140, 110:00-111:00, Rest period (49k; jpg)
Page 3-142, 111:00-112:00, Rest period (48k; jpg)
Page 3-144, 112:00-113:00, Rest period (47k; jpg)
Page 3-146, 113:00-114:00, Rest period (49k; jpg)
Page 3-148, 114:00-115:00, Rest period (49k; jpg)
Page 3-150, 115:00-116:00, Rest period (50k; jpg)
Page 3-152, 116:00-117:00, Wake-up, post-sleep activities, eat period (66k; jpg)
Page 3-154, 117:00-118:00, Eat period, suit donning (57k; jpg)
Page 3-156, 118:00-119:00, EVA-1 cabin and equipment prep, PLSS donning (87k; jpg)
Page 3-158, 119:00-120:00, PLSS checkout, cabin depressurization (97k; jpg)
Page 3-160, 120:00-121:00, Egress, TV deploy, LRV deploy/checkout, contingency sample (82k; jpg)
Page 3-162, 121:00-122:00, LRV nav initialization, drive to Station 1, Station 1 activities (86k; jpg)
Page 3-164, 122:00-123:00, Drive to station 2, Station 2 activities, drive to Station 3 (79k; jpg)
Page 3-166, 123:00-124:00, Drive to LM, ALSEP offload (78k; jpg)
Page 3-168, 124:00-125:00, ALSEP deployment (66k; jpg)
Page 3-170, 125:00-126:00, ALSEP deployment, photography, sampling, return to LM (82k; jpg)
Page 3-172, 126:00-127:00, Flag deploy, EVA Close-out, Ingress, Cabin Repressurization (89k; jpg)
Page 3-174, 127:00-128:00, Doff PLSS, suits, post-EVA activities (90k; jpg)
Page 3-176, 128:00-129:00, PLSS recharging, debriefing (71k; jpg)
Page 3-178, 129:00-130:00, Eat period, pre-sleep activities (58k; jpg)
Page 3-180, 130:00-131:00, Rest period (50k; jpg)
Page 3-182, 131:00-132:00, Rest period (49k; jpg)
Page 3-184, 132:00-133:00, Rest period (47k; jpg)
Page 3-186, 133:00-134:00, Rest period (50k; jpg)
Page 3-188, 134:00-135:00, Rest period (48k; jpg)
Page 3-190, 135:00-136:00, Rest period (47k; jpg)
Page 3-192, 136:00-137:00, Rest period (49k; jpg)
Page 3-194, 137:00-138:00, Rest period (52k; jpg)
Page 3-196, 138:00-139:00, Post-sleep, EVA-2 planing, eat period (59k; jpg)
Page 3-198, 139:00-140:00, Suit donning, EVA-2 prep (64k; jpg)
Page 3-200, 140:00-141:00, PLSS donning/checkout, don helmet/gloves (96k; jpg)
Page 3-202, 141:00-142:00, Cabin depressurization, egress, equipment prep (79k; jpg)
Page 3-204, 142:00-143:00, Drive to Station 4, Station 4 activities, drive to Front (87k; jpg)
Page 3-206, 143:00-144:00, Drive to Station 5, Station 5 activities (84k; jpg)
Page 3-208, 144:00-145:00, Drive to Station 6, Station 6 activities (79k; jpg)
Page 3-210, 145:00-146:00, Drive to Station 7, Station 7 activities (62k; jpg)
Page 3-212, 146:00-147:00, Drive to Station 8, Station 8 activities (76k; jpg)
Page 3-214, 147:00-148:00, Drive to LM, EVA Close-out (65k; jpg)
Page 3-216, 148:00-149:00, Ingress, repressurization, PLSS doffing, post-EVA activities (86k; jpg)
Page 3-218, 149:00-150:00, Doff suits, PLSS recharge (76k; jpg)
Page 3-220, 150:00-151:00, EVA debriefing, eat period (71k; jpg)
Page 3-222, 151:00-152:00, Pre-sleep activities, Rest period (61k; jpg)
Page 3-224, 152:00-153:00, Rest period (48k; jpg)
Page 3-226, 153:00-154:00, Rest period (46k; jpg)
Page 3-228, 154:00-155:00, Rest period (70k; jpg)
Page 3-230, 155:00-156:00, Rest period (58k; jpg)
Page 3-232, 156:00-157:00, Rest period (48k; jpg)
Page 3-234, 157:00-158:00, Rest period (48k; jpg)
Page 3-236, 158:00-159:00, Post sleep, EVA-3 planning, eat period (60k; jpg)
Page 3-238, 159:00-160:00, Eat period, suit donning (61k; jpg)
Page 3-240, 160:00-161:00, EVA-3 prep, PLSS donning (88k; jpg)
Page 3-242, 161:00-162:00, PLSS checkout, cabin depressurization (88k; jpg)
Page 3-244, 162:00-163:00, Egress, equipment prep, drive to Station 9 (73k; jpg)
Page 3-246, 163:00-164:00, Station 9 activities, drive to Station 10, Station 10 activities (75k; jpg)
Page 3-248, 164:00-164:30, Drive to Station 11, Station 11 activities, drive to Station 12 (83k; jpg)
Page 3-250, 164:30-165:00, Drive to Station 12, Station 12 activities (70k; jpg)
Page 3-252, 165:00-166:00, Drive to Station 13, Station 13 activities (75k; jpg)
Page 3-254, 166:00-167:00, Drive to Station 14, Station 14 activities, drive to LM (93k; jpg)
Page 3-256, 167:00-168:00, EVA Close-out, Ingress, Cabin repressurization (75k; jpg)
Page 3-258, 168:00-169:00, PLSS doffing, equipment jettison, IMU realign (114k; jpg)
Page 3-260, 169:00-169:30, Post EVA cabin cleanup (62k; jpg)
Page 3-262, 169:30-170:00, Eat period (62k; jpg)
Page 3-264, 170:00-170:30, Eat period, guidance and circut breaker checks, (58k; jpg)
Page 3-266, 170:30-171:00, Configure radar, RCS, IMU realign (75k; jpg)
Page 3-268, 171:00-171:30, Pre-launch switch configuration, pressurize APS (80k; jpg)
Page 3-270, 171:30-172:00, LM lift-off, pre-TPI activities (97k; jpg)
Page 3-272, 172:00-172:30, CSM tracking, TPI burn (64k; jpg)
Page 3-274, 172:30-173:00, MCC-1, MCC-2 activities (79k; jpg)
Page 3-276, 173:00-173:30, Final braking, maneuver to docking attitude (69k; jpg)
Page 3-278, 173:30-174:00, Docking, hatch opening (77k; jpg)
Page 3-280, 174:00-174:30, Clean and doff suits, transfer suits to CM (61k; jpg)
Page 3-282, 174:30-175:00, Transfer film magazines, samples to CM (60k; jpg)
Page 3-284, 175:00-176:00, Transfer samples, OPS to CM, configure comm (63k; jpg)
Page 3-286, 176:00-177:00, Configure LM for jettison, close hatch (75k; jpg)
Journal Home Page | Apollo 15 Journal |