Apollo 11 Technical Crew Debriefing - 31 July 1969
Scans and PDF formating by John Hargenrader, NASA HQ History Office, October 2005.
Adobe Acrobat Reader is required to read PDF files and can be downloaded at no cost.
Volume I
- Section 1 - Suiting and Ingress
- Section 2 - Status checks and Countdown
- Section 3 - Powered Flight
- Section 4 - Earth Orbit and Systems Checkout
- Section 5 - TLI through S-IVB Closeout
- Section 6 - Translunar Coast thru Drogue Removal
- Section 6 - Translunar Coast (continued)
- Section 7 - LOI through Lunar Module Activation
- Section 8 - Lunar Module checkout through Separation
- Section 9 - DOI through Touchdown
- Section 10 - Lunar Surface
Volume II
- Section 11 - CSM Circumlunar Operations
- Section 12 - Liftoff, Rendezvous, and Docking
- Section 13 - Lunar Module Jettison Through TEI
- Section 14 - Translunar Coast
- Section 15 - Entry
- Section 16 - Landing and Recovery
- Section 17 - Geology and Experiments
- Section 18 - Command Module Systems Operation
- Section 19 - Lunar Module Systems Operation
- Section 20 - Miscellaneous Systems, Flight Equipment, and GFE
- Section 21 - Visual Sightings
- Section 22 - Premission Planning
- Section 23 - Mission Control
- Section 24 - Training
- Section 24 - Training (continued), including Lunar Surface Training
- Section 25 - Human Factors
- Section 26 - Miscellaneous
- Section 27 - Concluding Comments (None)