Engineers at the Marshall Center test the 130-metric-ton heavy-lift configuration of the Space Launch System rocket in the Trisonic Wind Tunnel in Bldg. 4732. Image credit: NASA/MSFC
Engineers at the Marshall Center test the 130-metric-ton heavy-lift configuration of the Space Launch System rocket in the Trisonic Wind Tunnel in Bldg. 4732.
Image credit: NASA/MSFC