Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from July 2023

View All Posts

    ISS Daily Summary Report – 7/31/2023

    Payloads: Immunity Assay: The crew collected and processed various biological samples in support of the multi-day experiment session. The Monitoring the Cellular Immunity by In Vitro Delayed Type Hypersensitivity (DTH) Assay on the ISS (Immunity Assay) investigation aims to monitor the impact of spaceflight stressors on cellular immune functions in a blood sample, with the …

    Read Full Post

    ISS Daily Summary Report – 7/28/2023

    Payloads: ADvanced Space Experiment Processor (ADSEP): Historical documentation photos were taken of a crewmember removing the Tissue Cassette from the ADSEP Facility and then of the crewmember holding the Tissue Cassettes inside the Glovebag. ADSEP is a thermally controlled single-middeck-locker equivalent that accommodates up to three cassette-based experiments that can be independently operated. Its companion …

    Read Full Post

    ISS Daily Summary Report – 7/27/2023

    ISS Reboost: This morning, the ISS performed a reboost using the Aft Progress 83P rendezvous and docking (R&D) thrusters. This reboost is part of a series of reboosts to set up proper phasing conditions for the Progress 85P 34-orbit rendezvous in August. The burn duration was 5 minutes 30 seconds with a delta-V of 0.46 …

    Read Full Post

    ISS Daily Summary Report – 7/26/2023

    Payloads: Confocal Space Microscopy: The temperature logger was removed from Confocal Space Microscopy and the measurements were reported to the ground. The Confocal Space Microscope is a JAXA facility that provides fluorescent images of biological samples aboard the ISS. Confocal microscopy uses spatial filtering techniques to eliminate out-of-focus light or glare in specimens with thicknesses …

    Read Full Post

    ISS Daily Summary Report – 7/25/2023

    Payloads: Electromagnetic Levitator (EML): The EML high speed camera was set to Standard (STD) measurement mode. The EML is a facility composed of four inserts installed into the European Drawer Rack (EDR) for the electromagnetic levitation of samples. The experiment samples are installed in a dedicated sample chamber that is attached to EML and can …

    Read Full Post

    ISS Daily Summary Report – 7/24/2023

    Payloads: Astrobee: The perching arm was removed from the Astrobee flyer. Astrobee is made up of three free-flying, cube-shaped robots. These robots are designed to help scientists and engineers develop and test technologies for use in microgravity to assist astronauts with routine chores and give ground controllers additional eyes and ears on the space station. …

    Read Full Post

    ISS Daily Summary Report – 7/21/2023

    Payloads: Astrobee: The Astrobee flyers were prepped and JEM stowage was cleared in preparation for remote video operations. Astrobee is made up of three free-flying, cube-shaped robots. These robots are designed to help scientists and engineers develop and test technologies for use in microgravity to assist astronauts with routine chores, and give ground controllers additional …

    Read Full Post

    ISS Daily Summary Report – 7/20/2023

    Payloads: BioFabrication Facility (BFF): Media bags were retrieved from the Iceberg-1 cold stowage facility and were temporarily stowed near the BFF facility. Using 3D biological printers to produce usable human organs has long been a dream of scientists and doctors around the globe; however, printing the tiny, complex structures found inside human organs, such as …

    Read Full Post

    ISS Daily Summary Report – 7/19/2023

    Payloads: Gradient Heating Furnace (GHF): The GHF Material Processing Unit heater insulation was measured for resistance using a multimeter. The GHF is a vacuum furnace that contains three heating blocks. Their positions and temperatures can be independently controlled, and various temperature profiles can be realized. This facility will be mainly used for high quality crystal …

    Read Full Post

    ISS Daily Summary Report – 7/18/2023

    Payloads: Advanced Resistive Exercise Device Kinematics (ARED-K): The acquisition unit was partially set up in Node 3 for a remote ground connection. The ARED-K investigation assesses the current exercise programs to allow for the improvement of exercise prescriptions by conducting a biomechanical analysis of exercise on the ARED onboard the ISS. ISS Ham Radio: An …

    Read Full Post