Japanese Small Satellite Orbital Deployer (J-SSOD) #13: The crew performed photographic documentation of the J-SSOD#13 deployment. The JEM Small Satellite Orbital Deployer (J-SSOD) provides a novel, safe, and small satellite launching capability to the International Space Station (ISS). The J-SSOD is a unique satellite launcher, handled by the Japanese Experiment Module Remote Manipulator System (JEMRMS), which provides containment and deployment mechanisms for several individual small satellites. Once J-SSOD, including satellite install cases with small satellites, is installed on the Multi-Purpose Experiment Platform (MPEP) by crew members, it is passed through the JEM airlock for retrieval, positioning, and deployment by the JEMRMS.

SlingShot: The crew performed a partial setup of the Slingshot payload in order to allow ground commanding to test the WIDAR communication link through Wallops ground site using the Cygnus spacecraft. Unfortunately, the data cables did not connect properly and the task was aborted. Ground teams are discussing a forward plan to get a data connection in order to proceed with the test at a later date. SEOPS’ SlingShot is a small satellite deployment system that fits inside the Cygnus spacecraft’s Passive Common Berthing Mechanism (PCBM). SlingShot can accommodate up to 18 satellites that are deployed post Cygnus unberth.

Advanced Combustion via Microgravity Experiments (ACME): The crew replaced an ACME controller In preparation for the continuation of s-flame runs. The ACME experiment series being performed in the CIR includes five independent studies of gaseous flames. The primary goals of ACME are to improve fuel efficiency and reduce pollutant production in routine fuel combustion activities on Earth. Its secondary goal is to improve spacecraft fire prevention through innovative research focused on materials flammability.

Systems

Acoustic Monitoring: Crew-worn acoustic monitors were set up and distributed to the crew onboard the ISS. These will be worn for 24 hours before they will be deployed to static locations within ISS. The acoustic monitoring sessions gather data to characterize any changes to the acoustic environment throughout the station.

Completed Task List Activities:

  • Network Attached Storage (NAS) Hard Drive Swap

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • Ground Cmding for SlingShot Test

Look Ahead Plan

Wednesday, 4/29 (GMT 120)
Payloads:

  • Astrobee Battery change (NASA)
  • VEGGIE PONDS Facility Clean (NASA)
  • RED-EYE temp Stowed during Astrobee mapping ops (NASA)

Systems:

  • Acoustic Monitoring Setup – Static Measurements
  • EVA Loops Scrubs for units 3004/3008
  • EHS TOCA Calibration Check
  • O-OHA Test

Thursday, 4/30 (GMT 121)
Payloads:

  • Astrobee Localization and Mobility ops (NASA)
  • CBEF 2nd cleaning post MHU-5 (JAXA)
  • Space Fiber Stow (NASA)
  • Food Physiology (NASA)
  • VEGGIE PONDS Facility Deact (NASA)
  • ISS HAM Pass (NASA)

Systems:

  • EHS TOCA Water Sample Analysis
  • JEM CTB Relocate
  • Acoustic Monitor Data Transfer and Stow

Friday, 5/1 (GMT 122)
Payloads:

  • RADIN SBD deploy (CSA)
  • JSSOD-13 removal (JAXA)
  • CIR Manifold Bottle change (Joint)
  • RED-EYE restow (NASA)

Systems:

  • Cygnus Cargo Ops

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Verification of anti-virus scan results on Auxiliary Computer System [ВКС] laptops
  • SlingShot BPW Review
  • Regeneration of Micropurification Unit (БМП) Ф1 Absorption Cartridge (init)
  • Remove Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPA) Removal
  • ПC1, ПС2 Dust Collectors Filters Vacuum Cleaning in FGB (panels 203, 403)
  • Teardown [ПТАБ-2] (А304)
  • Food Acceptability Survey
  • LIGHTING SYSTEM AUDIT in FGB
  • JEMRMS Small Satellite Deployment Observation
  • Acoustic Monitor Setup for Crew Worn Measurements
  • SlingShot Controller Install
  • [ВБП1] and [ВПБ2] Fans screen cleaning
  • INSTALLATION OF ПТАБ-2 (POSITION A304)
  • Photography of Plume Impingement and Deposit Monitoring Unit [БКДО] position on MRM2 through SM window No.13
  • ACME Controller Replace 1 in Combustion Integrated Rack (CIR)
  • Current converter fan (ВПТ) screen cleaning
  • URAGAN. BCC P/L Adjustment and Testing
  • Diagnostics of FGB Power Supply System Filter Units (БФ-1М) and Main Bus Assembly (БСШ-1М) – preparation steps
  • Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
  • Early unstow and US cargo transfers from Progress 448 (SM Aft) and IMS Ops
  • Progress 443 (DC1) Stowage Ops with IMS Support
  • Video Footage of Greetings
  • JEMRMS Small Satellite Deployment Observation
  • ODF update using Progress 448 delivered files
  • Public Affairs Office (PAO) Event in High Definition (HD) – JEM
  • Acoustic Monitor Battery Swap
  • SlingShot WIDAR STOW
  • On-Orbit Hearing Assessment (O-OHA) with EarQ Software Setup and Test