Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from June 2019

View All Posts

    ISS Daily Summary Report – 6/13/2019

    ISS HAM pass: The crew completed a HAM pass with Peninsula Grammar, Melbourne, Australia, which is a boarding school for approximately 1400 students from three-year old kindergarten to Year 12.  The participants had questions for the crew about first aid in space, how the crew’s understanding of the universe has been changed by their time …

    Read Full Post

    ISS Daily Summary Report – 6/12/2019

    Fluids Integrated Rack (FIR)/Light Microscopy Module (LMM)/ACE Module Changeout: The crew removed the processed ACE-T12 Module and installed the ACE-T10 Module. In contrast to the ACE-T12, which studied nanoparticle haloing (a mixture of non-charged large particles with much smaller charged particles), ACE-T10 looks at crystal nucleation in colloidal fluids, the origin of ageing in glasses …

    Read Full Post

    ISS Daily Summary Report – 6/11/2019

    Airway Monitoring: The crew located the hardware and reviewed the Big Picture Words in preparation for the Airway Monitoring ambient pressure session activities later this week. The primary goals of the experiment is to determine how gravity and microgravity influence the turnover of Nitric Oxide in the lungs. During future manned missions to the Moon …

    Read Full Post

    ISS Daily Summary Report – 6/10/2019

    BioNutrients: The crew performed a hydration and agitation for the BioNutrients experiment and started the 48 hour incubation at 30 deg C.  BioNutrients demonstrates a technology that enables on-demand production of human nutrients during long-duration space missions. The process uses engineered microbes, like yeast, to generate carotenoids from an edible media to supplement potential vitamin …

    Read Full Post

    ISS Daily Summary Report – 6/06/2019

    Fluidics: As a continuation of the Fluidics session which began on Wednesday, the crew performed 3 additional experiment runs (2A, 2B, 3). The measurement of liquid displacement within a sphere in microgravity relates to a given kinematic representation of a spacecraft’s fuel tank. This investigation evaluates the Center of Mass (CoM) position regarding a temperature …

    Read Full Post

    ISS Daily Summary Report – 6/05/2019

    Capillary Structures: The crew performed a scheduled battery exchange for the camera and flash system used for Capillary Structures. They also refilled the science containers to allow further evaporator science operations. Earlier in the day, it was noted the camera battery failed earlier than expected, resulting in a loss of 10-12hrs of imagery. Ground teams …

    Read Full Post

    ISS Daily Summary Report – 6/04/2019

    71 Progress (71P) Undock: Progress undocked from the Service Module (SM) Aft Port at 3:40 AM CT. After a successful de-orbit burn, the vehicle completed its mission following destructive re-entry over the Pacific Ocean at 7:22 AM CT. ISS Experience: The crew set up the ISS Experience hardware in the Node 1 starboard hatch area.  …

    Read Full Post

    ISS Daily Summary Report – 6/03/2019

    SpaceX (SpX)-17 Departure: Following yesterday’s cargo transfer, Dragon egress and hatch closure operations, ground controllers successfully unberthed the vehicle from the Node 2 Nadir port at 7:25 AM CT.  After a nominal release at 11:00 AM CT, Dragon completed a series of separation burns and is progressing towards a splashdown in the Pacific Ocean today …

    Read Full Post

    ISS Daily Summary Report – 6/02/2019

    SpaceX-17 Dragon Status: Today the crew completed cargo transfer into the Dragon vehicle followed by a conference with ground teams. Following cargo loading, the crew rotated the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs), installed CPA 4 and closed out the vestibule prior to egressing the vehicle. These activities are in preparation for Dragon …

    Read Full Post