Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from August 2018

View All Posts

    ISS Daily Summary Report – 8/17/2018

    SUPVIS-JUSTIN: The crew set up and performed protocol operations for ESA’s SUPVIS-Justin investigation today. SUPVIS-Justin, part of the Meteron program, aims to demonstrate that an astronaut on an orbiting space station can command a robot via a tablet PC to perform complex tasks on a planetary surface. The SUPVIS-Justin experiment includes an extended supervised autonomy …

    Read Full Post

    ISS Daily Summary Report – 8/16/2018

    Russian ExtraVehicular Activity (EVA) 45: Yesterday, Artemyev (EV1) and Prokopev (EV2) exited the Docking Compartment (DC)1 at 11:17 AM CDT and completed Russia EVA #45 with a Phased Elapsed Time (PET) of 7 hours and 46 minutes. The crew was able to complete the following tasks: Deployment of 2 nanosatellites “Tanyusha-YuZGU” Deployment of 2 nanosatellites …

    Read Full Post

    ISS Daily Summary Report – 8/15/2018

    Russian ExtraVehicular Activity (EVA) 45: Today Artemyev (EV1) and Prokopev (EV2) exited the Docking Compartment (DC)1 at 11:17 AM CDT in order to complete Russia EVA #45. The EVA is on-going and the Russian Crew are working to complete the following tasks: Deployment of 2 nanosatellites “Tanyusha-YuZGU” [Completed] Deployment of 2 nanosatellites “SiriusSat” [Completed] Panoramic …

    Read Full Post

    ISS Daily Summary Report – 8/14/2018

    Biological Experiment Laboratory (BioLab):  The crew installed a new BioLab Incubator Door Locking Bolt today. The BioLab is a multiuser research facility located in the Columbus laboratory. It is used to perform space biology experiments on microorganisms, cells, tissue cultures, small plants, and small invertebrates. BioLab allows scientists to gain a better understanding of the effects …

    Read Full Post

    ISS Daily Summary Report – 8/13/2018

    Microbial Tracking-2 (MT-2): The crew collected saliva and blood samples for the Microbial Tracking-2 investigation. MT-2 monitors the different types of microbes that are present on ISS over a 1-year period. After the samples are returned to Earth, a molecular analysis of the RNA and DNA will be conducted to identify the specific microbes that …

    Read Full Post

    ISS Daily Summary Report – 8/10/2018

    Japanese Small Satellite Orbital Deployer 9 (J-SSOD#9): Robotics Controllers in Tsukuba, Japan maneuvered the Japanese Experiment Module (JEM) Remote Manipulator System (JEMRMS) to the Small Satellite Deploy Position and deployed the Japanese Small Satellite Orbital Demonstration (JSSOD)-9 satellites. These satellites are 1U CubeSats and were developed by Bhutan, the Philippines, and Malaysia. The crew supported the …

    Read Full Post

    ISS Daily Summary Report – 8/09/2018

    HTV-7 Rack Relocation Prep: This week the crew has been executing a series of activities in order to prepare ISS for the installation of new racks arriving on HTV-7. After relocating and consolidating stowage earlier in the week, two crewmembers relocated five racks today within and between various modules in the US Segment. Prior to …

    Read Full Post

    ISS Daily Summary Report – 8/08/2018

    Japanese Experiment Module (JEM) Moderate Temperature Loop (MTL) Leak Update: Express Rack (ER)5 was isolated yesterday as part of the on-going search for the JEM MTL leak. While Space Station Integration and Promotion Center (SSIPC) continues to monitor total JEM MTL fluid volume, the slow low leak rate takes approximately 24 hours to manifest in …

    Read Full Post

    ISS Daily Summary Report – 8/07/2018

    Japanese Experiment Module (JEM) Moderate Temperature Loop (MTL) Leak Update: The JEM MTL leak continues with the rate of 20 mL/day. On Friday, the crew completed a visual inspection of the Gas Trap Bypass Valve in the JEM Thermal Control System (TCS)2 rack but were unable to find evidence of a leak. They also isolated …

    Read Full Post

    ISS Daily Summary Report – 8/03/2018

    SpaceX-15 Dragon Unberth and Release: Early this morning, the crew removed power connections, utility jumpers and completed closeout of the Dragon vehicle prior to depressurization of the Node 2 (N2) Nadir vestibule. Robotics ground controllers used the Space Station Remote Manipulator System (SSRMS) to unberth Dragon at 9:37 AM CDT and the crew released the …

    Read Full Post