Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from February 2017

View All Posts

    ISS Daily Summary Report – 2/28/2017

    Lab Carbon Dioxide Removal Assembly (CDRA) Maintenance: The adsorbent material (Zeolite) inside the CDRA beds breaks down over time and creates dust.  This dust eventually reduces airflow through the beds to the point where CDRA can no longer operate.  The Node 3 CDRA has newer generation beds that can be disassembled and serviced on orbit.  …

    Read Full Post

    ISS Daily Summary Report – 2/27/2017

    Rodent Research-4 (RR-4) Transfer Operations: Saturday, the crew reported all of the animals were successfully transferred them from the SpX-10 transporters to the four Rodent Research Habitats on the ISS. Sunday, the crew cleaned and stowed the transporters. The Tissue Regeneration-Bone Defect (RR-4) studies what prevents vertebrates such as rodents and humans from regrowing lost …

    Read Full Post

    ISS Daily Summary Report – 2/24/2017

    66 Progress (66P) Docking: The Progress MS-05 (66P) rendezvous and docking to ISS Docking Compartment (DC)-1 nadir port was completed successfully in the automated mode.  The docking capture time was 055/08:29:50 GMT (2:35 am CDT).  Following hatch opening the crew transferred early unstow and US cargo items.  Rodent Research-4 (RR-4) Operations: The crew conduced a …

    Read Full Post

    ISS Daily Summary Report – 2/23/2017

    66 Progress (66P) Launch: All 66P systems are performing nominally. One rendezvous maneuver, DV3, was performed nominally earlier today. Checkouts of the Progress TORU system and the Progress TV system 9 have been completed with nominal results. Docking is scheduled for Friday, February 24th at 2:35 am CST. SpaceX (SpX)-10 Capture: After yesterday’s aborted rendezvous, …

    Read Full Post

    ISS Daily Summary Report – 2/22/2017

    66 Progress (66P) Launch: 66P launched successfully from Baikonur, Kazakhstan on Tuesday at 11:23 pm CST with nominal ascent. Docking is scheduled for Friday, February 24th at 2:36 am CST. SpaceX (SpX)-10 Capture: This morning’s rendezvous was aborted as a result of a bad ISS state vector being uplinked to the Dragon vehicle.  The SpaceX …

    Read Full Post

    ISS Daily Summary Report – 2/21/2017

    Preparation for Dragon Arrival:  Dragon successfully lifted off on the SpaceX Falcon 9 rocket from Launch Pad 39A at Kennedy Space Center, Florida Sunday 19-February at 8:39 am CST.  Today Dragon will continue to phase towards the ISS for a planned capture on Wednesday 22-February at approximately 5:00 am CST.  Onboard the ISS the USOS …

    Read Full Post

    ISS Daily Summary Report – 2/18/2017

    With the delay in SpaceX-10 launch, Monday will be an off duty day for the ISS crew.  There will be no IMC reports sent on Monday, February 20th. Nominal reporting will resume Tuesday morning.

    Read Full Post

    ISS Daily Summary Report – 2/17/2017

    NanoRack Cubesat Deployer (NRCSD) #10 Installation: This morning the crew installed two Quad deployers on the attachment mechanisms on the JEM Airlock (JEMAL) Slide Table. Only one Quad has satellites loaded, the second Quad is required for proper fit of the Multi-Layered Insulation (MLI) protective cover.  The deployment is scheduled for after the berthing and …

    Read Full Post

    ISS Daily Summary Report – 2/16/2017

    Transition to (X2) R15 Software:  As part of the R15 software transition, the Starboard 1 (S1) and Port 1 (P1) Multiplexer/Demultiplexers (MDMs) were transitioned to updated software S1P1 R6. Updates to the S1 and P1 MDMs include:  Longeron Fault Detection Isolation & Recovery (FDIR) updates to protect for Beta Gimbal Assembly (BGA) stall conditions Thermal …

    Read Full Post

    ISS Daily Summary Report – 2/15/2017

    Transition to (X2) R15 Software:  As part of the R15 software transition, the Payload (PL) Multiplexer/Demultiplexers (MDMs) were transitioned to updated software Payload Executive Processor R12 (PEP R12) today. Updates to the PL MDMs include:  Redundancy Management Time Reduction Additionally, the Lab-1 (LA-1) MDM was transitioned to Lab System-R5 (LSYS1-R5) software. Updates to the LA-1 …

    Read Full Post