ISS Daily Summary Report – 10/23/2016
Cygnus Rendezvous and Capture: This morning the crew monitored the Cygnus approach from the Cupola Robotic Workstation and successfully captured Cygnus using the Space Station Remote Manipulator System (SSRMS) at 6:28 am CDT. The Ground Robotics team maneuvered Cygnus into position to inspect the Passive Common Berthing Mechanism (CBM), and berthed Cygnus onto the Node-1 Nadir Active CBM. Later, the crew removed the Centerline Berthing Camera System (CBCS) from the Node-1 Nadir hatch window. The crew performed a leak check and configured the vestibule for ingress. Controller Panel Assembly (CPA) removal and hatch opening/ingress are scheduled for Thursday, October 27th.
Crew Quarters (CQ) 9 Volt Battery Changeout: Today, the crew replaced the 9 volt batteries in all four CQs. This maintenance is required every twelve months. These batteries are used to power the Caution & Warning (C&W) alarm speakers and the Egress Light Emitting Diodes (LEDs).
Today’s Planned Activities
All activities were completed unless otherwise noted.
- USOS Window Shutter Close
- HRF Generic Urine Collection
- HRF Generic Sample MELFI Retrieval Insertion Operations
- CONJUGATION ТБУ-[В]#02 Thermostat Setup
- KORREKTSIA. Taking food and liquids (medicine) registration in flight log
- Centerline Berthing Camera System (CBCS) Powerup
- Closing Window Shutters # 6, 8, 9, 12, 13, 14
- T2 Crew Handover
- ISS Crew Adaptation
- Photo/TV Ghost Camera in Cuopla on SSC power recording
- ISS HAM Video Power Down
- Robotics Workstation (RWS) Configuration
- Cygnus PCS Command and PROX Link Verification
- HRF Generic Sample MELFI Insertion Operations
- Robotic Workstation (RWS) High Definition (HD) Monitor Downlink
- Cygnus R-BAR Approach
- Space Station Remote Manipulator System (SSRMS) Cygnus Capture
- Video Recording of greetings
- Remote Workstation Monitor HD Video Downlink Deactivation RWS.
- HRF Generic Urine Collection Stow
- BIOPLENKA. Cryogem-03 thermostat setup
- Regenerative Environmental Control and Life Support System (RGN) WSTA Fill
- KORREKTSIA. Taking food and liquids (medicine) registration in flight log
- СОЖ maintenance
- In Flight Maintenance (IFM) Crew Quarters (CQ) Battery Remove and Replace
- PCS Laptop Relocate
- Symbolic Activity
- PCS Laptop Relocate
- Node 1 Centerline Berthing Camera System (CBCS) Removal
- Ghost camera teardown in Cupola
- Robotic Workstation (RWS) Teardown
- Symbolic
- Cygnus/Node 1 Pressurization and Leak Check
- Node 1 Nadir to Cygnus Vestibule Outfitting
- Vacuum cleaning behind panels 405 and 406 in MRM 1
- MICROVIR. Glovebox-S hardware setup
- ISS HAM Video Power Up
- Meteor Shutter Open
- Space Headaches – Daily Questionnaire
- Cygnus PROX Switch OFF
Completed Task List Items
- None
Ground Activities
All activities were completed unless otherwise noted.
- SSRMS Maneuver to N1 Nadir CBM
- CBM Bolting Operations
Three-Day Look Ahead:
- Monday, 10/24: BEAM Ingress, Airway Monitoring Setup, Cygnus Cargo Transfer Review
- Tuesday, 10/25: Emer H/W Fam, Veggie-3, Airway Monitoring
- Wednesday, 10/26: Soyuz Drill, Neuromapping, Dosetrack, Meteor, JAXA EPO
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Operate |
Major Constituent Analyzer (MCA) Node 3 | Idle |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Process |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full Up |