    ISS Daily Summary Report – 09/30/2016

    ENERGY (Astronaut’s Energy Requirement for Long-Term Space Flight): Today, FE-5 continued with Day 2 of the 11 day ENERGY experiment. The second day activities include the consumption of a standardized breakfast, continued diet logging, continued wear of the Armband Activity Monitor, double labeled water intake, oxygen uptake measurements, and urine collection. FE-6, as the control …

    Read Full Post

    ISS Daily Summary Report – 09/29/2016

    Group Combustion Module (GCM) Installation: FE-5 continued with the third day of installation and preparation for the GCM experiment and was to perform two pressure decay leak checks. After the first check, a leak was detected in the Air/O2 line, thus aborting the second check until specialist can determine the cause and develop a solution. …

    Read Full Post

    ISS Daily Summary Report – 09/28/2016

    Marangoni Experiment (Dynamic Surf 3): Overnight another run of the Marangoni experiment occurred in the Fluid Physics Experiment Facility (FPEF). The Dynamic Surf investigation is part of a series of JAXA experiments studying Marangoni convection driven by the presence of surface tension gradients produced by a temperature difference at a liquid/gas interface. By observing and …

    Read Full Post

    ISS Daily Summary Report – 09/27/2016

    Group Combustion Module (GCM) Installation:  Today, FE-5 with the assistance of FE-6, started the first of two days of installation and preparation for the GCM experiment.  The crew began with assembly of the GCM attaching cameras and the Fuel Supply Syringe.  Following GCM setup, the crew then began configuration of the Combustion Chamber attaching the …

    Read Full Post

    ISS Daily Summary Report – 09/26/2016

    Multi-Purpose Experiment Platform (MPEP)/Small Fine Arm Attachment Mechanism (SAM) removal: FE-5 retracted the Japanese Experiment Module Airlock (JEMAL) slide table into the module and removed the MPEP and SAM.  Tomorrow, the crew will ingress Pressurized Mating Adapter-2 (PMA2) to retrieve the JEM ORU Transfer Interface (JOTI) and install it on the Slide Table to support …

    Read Full Post

    ISS Daily Summary Report – 09/23/2016

    NanoRack Cubesat Deployer (NRCSD) Removal: FE-5 removed the NanoRack deployer from the Multi-Purpose Experiment Platform (MPEP) Japanese Experiment Module Airlock (JEMAL) Slide Table, following the successful deployments of 8 DoveSat satellites last week.  The next use of the JEMAL will be for Robotics External Leak Locator (RELL), which aims to demonstrate that commercial off-the-shelf (COTS) …

    Read Full Post

    ISS Daily Summary Report – 09/22/2016

    Story Time From Space: FE-6 completed the video recording that was started yesterday that demonstrates how a balance scale can be used to exhibit balance in microgravity.  Story Time From Space combines science literacy outreach with simple demonstrations recorded aboard the ISS. Crew members read five science, technology, engineering and mathematics-related children’s books in orbit, …

    Read Full Post

    ISS Daily Summary Report – 09/21/2016

    Multi-Purpose Small Payload Rack (MSPR) Combustion Chamber Adapter Plate Attachment: FE-5 installed the Combustion Chamber adapter plate in the MSPR Work Volume.  Next week, the crew will be installing and with ground support, initiating the Group Combustion experiment. The Group Combustion investigation tests a theory that fuel sprays change from partial to group combustion as …

    Read Full Post

    ISS Daily Summary Report – 09/20/2016

    Japanese Experiment Module Airlock (JEMAL) Repressurization: This morning, FE-5 initiated a repress of the JEMAL then performed a leak check of the airlock.  Later this week, the crew will remove the NRCSD from the airlock.  Water Monitoring Suite – Microbial Monitoring System (WMS – MMS): FE-6 began operations with the MMS subset of the WMS …

    Read Full Post

    ISS Daily Summary Report – 09/19/2016

    Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI)-2 Auto-Stop Transition: On Sunday, ground teams received notification that MELFI-2 in the Japanese Experiment Module (JEM) transitioned to Auto-stop.  The Brayton Motor powered off, and the rack maintained power and good Low Temperature Loop (LTL) flow.  The Cold Stowage team noted that the way the MELFI …

    Read Full Post