Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from July 2016

View All Posts

    ISS Daily Summary Report – 07/29/2016

    Body Measures Operations: Two crewmembers, one as the subject and the other providing operator assistance, completed a Body Measures data collection session that began last week. They set up cameras and video, then collected the Neutral Body Posture video and stow the equipment. NASA is collecting in-flight anthropometric data (body measurements) to assess the impact …

    Read Full Post

    ISS Daily Summary Report – 07/28/16

    Mouse Epigenetics Cage Unit Maintenance: The Mouse Cage Units containing the mice were transferred to the glove box from the Cell Biology Experiment Facility (CBEF) while the crew conducted standard cleaning and maintenance on the Mouse Habitat Cage Units. The Mouse Epigenetics investigation studies altered gene expression patterns in the organs of male mice that …

    Read Full Post

    ISS Daily Summary Report – 07/27/16

    Biological Rhythms 48 Holter and Actiwatch Removal and Data Save: Upon completion of the Biological Rhythms recording session, today the crewmember removed the Digital Walk Holter Electrocardiogram (ECG) and the Actiwatch Spectrum from his body and saved the data collected from the holter and the multi-media card to the medical laptop. This concluded a series …

    Read Full Post

    ISS Daily Summary Report – 07/26/16

    Biological Rhythms 48 Multi Media Card Exchange: The crew stopped the first half of the 24-hour recording that began yesterday and changed out the Multi Media Card and battery of the Digital Walk Holter ECG, then began the second half of the 24-hour recording. The objective of the Japan Aerospace Exploration Agency (JAXA) Biological Rhythms …

    Read Full Post

    ISS Daily Summary Report – 07/25/16

    Biological Research In Canisters (BRIC) 23: Over the weekend, the crew transferred all four of the BRIC-23 canisters that were actuated last week to the Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI).  Two of the four canisters were transferred to MELFI following a 24-hour growth period and the remaining two canisters were transferred …

    Read Full Post

    ISS Daily Summary Report – 07/22/16

    Thermolab Deinstrumentation for Circadian Rhythms: The crew removed the double sensors and Thermolab Unit before cleaning and stowing the equipment following completion of the European Space Agency (ESA) Circadian Rhythm experiment. The measurement process took 36 hours to complete.  Biological Rhythms 48 Hours Actiwatch Preparation: Today, the crew configured and donned the Actiwatch to commence …

    Read Full Post

    ISS Daily Summary Report – 07/21/16

    Dragon Operations:  The crew was scheduled to ingress and configure Dragon for on-orbit operations today, however, these tasks were completed yesterday. Today they transferred critical cargo and unpacked double cold bags to retrieve science as well as transferring 2 “Polar” freezers from Dragon into the EXPRESS rack locations that had been prepared for them.  Mouse …

    Read Full Post

    ISS Daily Summary Report – 07/20/16

    SpaceX (SpX)-9 Capture: The Dragon vehicle was successfully captured by the SSRMS at 5:56AM CDT today. Ground teams then berthed the vehicle to the Node 2 Nadir (N2N) port at approximately 9 AM, after which the crew performed vestibule pressurization and outfitting.  Thanks to the crew and ground operators getting ahead of the timeline, they …

    Read Full Post

    ISS Daily Summary Report – 07/19/16

    64 Progress (64P) Docking: 64P docked successfully to the ISS Docking Compartment (DC)-1 nadir port last night at 7:22PM CDT. Following hatch opening the crew transferred early unstow and US cargo items. Skin-B Operations: The crew performed Corneometer, Tewameter and Visioscan measurements on his forearm for this experiment. The Corneometer measures the hydration level of …

    Read Full Post

    ISS Daily Summary Report – 07/18/16

    64 Progress (64P) Launch: 64P launched successfully from Baikonur, Kazakhstan on Saturday at 4:41PM CDT with nominal ascent. Docking is scheduled for this evening at 7:22PM CDT. SpaceX (SpX)-9 Launch: SpX-9 launched successfully on Sunday at 11:45PM CDT. Capture is scheduled on Wednesday, July 20 at 6:00AM CDT with berthing approximately 3.5 hours later. Ingress …

    Read Full Post