Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

ISS Daily Summary Report – 06/22/15

Sleep ISS-12: Kelly and Kornienko are performing a week of sleep logging. Within fifteen minutes of wakeup, the crew answered questions from the SleepLog application on the Station Support Computer (SSC). The Sleep ISS-12 experiment monitors ambient light exposure and crew member activity and collects subjective evaluations of sleep and alertness, to examine the effects of space flight and ambient light exposure on sleep during a year-long mission on the ISS.

Habitability: Kelly resumes the Habitability activity this week after successfully reloading the iShort application to the tablet last week. He answered a questionnaire that focuses on habitability and his interactions with ISS systems. Habitability assesses the relationship between crew members and their environment in order to better prepare for future long-duration spaceflights to destinations such as Near Earth Asteroids (NEA) and Mars. The ultimate goal is to understand how much habitable volume is required for vehicle internal design and layout, and if mission duration impacts the volume needed.

On Board Training (OBT) 42 Soyuz (42S) Emergency Descent Drill: All 3 crew members participated in this emergency decent drill. The drill is scheduled 12-14 weeks aboard the ISS, then once every 2.5 months. This training session focused on off-nominal procedures that would be used in the event the crew needed to egress the ISS and perform an emergency descent.

SpaceX (SpX)-7 Arrival Preparations: Kelly and Padalka completed another session of robotics training to practice tracking and capture of the Dragon vehicle. They also powered up and checked out the Commercial Orbital Transportation Services (COTS) Ultra High Frequency (UHF) Communication Unit (CUCU) and Dragon Crew Command Panel (CCP). Finally, they placed the Node 2 nadir hatch to the unlatch position.

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • Regeneration of the Micropurification Unit (БМП) Ф1 cartridge (begin)
  • [ВКС] laptops antivirus software update / r/g 8247
  • BIOME- Completion of the questionnaire
  • ISS Emergency Soyuz Descent OBT. / r/g 9129
  • SEISMOPROGNOZ. Data Transfer from Control and Data Acquisition Module (МКСД) hard drive (begin) RSE1 spectrum search (begin). / r/g 9125
  • CUCU Activation
  • Dragon Robotics Review
  • CUCU and CCP checkout
  • PAO video recording / r/g 9130
  • Verifying JLP, JEMRMS, ISPR A2, A3, fire indication function.
  • ЕДВ ([КОВ]) No. 1106 (00063570R) filling (separation) for Elektron r/g 8936
  • Monitoring of ИП-1 air flow sensors installation
  • RR – sample relocation in MELFI
  • IMS Delta File Prep
  • HABIT – Questionnaire completion
  • URAGAN. Observations and Photography / r/g 9131
  • N2 Nadir Hatch Unlatching
  • Greasing of ARED upper stops cables
  • SEISMOPROGNOZ. Data Transfer from Control and Data Acquisition Module (МКСД) hard drive (end) and beginning of archiving. RSE1 spectrum search (end). / r/g 9125
  • Regeneration of the Micropurification Unit (БМП) Ф1 cartridge (end)
  • Preparation for the antivirus scanning of [ВКС] laptops / r/g 8247

Completed Task List Items

  • GPS downlink message
  • LAB1OP4 BBA R&R

Ground Activities
All activities were completed unless otherwise noted.

  • CUCU checkout

Three-Day Look Ahead:

  • Tuesday, 06/23: Dragon Offset Grapple, Biome, BCAT, PWD Sample Collect and TOCA Analysis
  • Wednesday, 06/24: Dragon OBT RoBOT, Biome
  • Thursday, 06/25: Ocular Health, Dragon OBT RoBOT, Sprint

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Shutdown

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Standby

Urine Processing Assembly (UPA)

Process

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full Up