Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

ISS Daily Summary Report – 06/19/15

Ocular Health: Kelly and Kornienko completed their Flight Day (FD) 90 Ocular Health activities with their ultrasound session, Padalka was the ultrasound operator for both sessions. The ultrasound images will be used to identify changes in globe morphology, including flattening of the posterior globe, and document optic nerve sheath diameter, optic nerve sheath tortuosity, globe axial measurements, and choroidal engorgement. The Ocular Health protocol calls for a systematic gathering of physiological data to characterize the risk of microgravity-induced visual impairment/intracranial pressure in ISS crewmembers.

Fluids Integrated Rack (FIR) Lamp Replacement: To prepare for the Microchannel Diffusion Experiment (MDE), which is flying on SpaceX-7, Kelly replaced a burned out lamp in the FIR.

Spaceflight Effects on Neurocognitive Performance: Extent, Longevity, and Neural Bases (NeuroMapping): Kelly completed his FD90 NeuroMapping sessions today. A subset of behavioral assessment tests were performed to complement the pre- and post-flight testing, including a mental rotation test, dual task test, and a joystick-based sensorimotor adaptation test. As a 1-year crewmember, Kelly will perform six in-flight NeuroMapping sessions throughout his mission. NeuroMapping studies whether long-duration spaceflight causes changes to the brain, including brain structure and function, motor control, and multi-tasking abilities. It also measures how long it would take for the brain and body to recover from possible changes.

On Board Training (OBT) Robotics On Board Trainer (RoBOT): In preparation for SpX-7 arrival Kelly (M-1) and Padalka (M-2) completed their second SpX-7 training session using RoBOT. This session focused on introducing Padalka to SSRMS Hot Backup operations as well as SSRMS malfunction recovery during track and capture. Kelly also lead Padalka through the Free-Flyer Capture Cue Card as well as star blocks of the SSRMS capture procedure.

Today’s Planned Activities
All activities were complete unless otherwise noted.

  • LAB Bacteria Filter Inspection
  • OTKLIK. Hardware Check / r/g 8408
  • ISS crew and ГОГУ (RSA Flight Control Management Team) weekly conference r/g 9102
  • Replacement of РТ-50-1М No.4 and No.11 (А204, А211) r/g 9121
  • USND2 – activation of Ultrasound Hardware and Camcorder
  • NeuroMapping Neurocognitive Test Operations Subject
  • Ultrasound 2 – Scanning Prep
  • Ultrasound 2 – Scanning (Operator)
  • Ultrasound 2 – Scan (Subject)
  • Demating РТ-50-1М TLM Connectors from БКС./ r/g 9121
  • Ultrasound 2 – Data Export
  • Potable bus sample
  • WRS – Recycle Tank Fill
  • Ultrasound 2 – Closeout ops
  • Replacement of РТ-50-1М No.4 and No.11 (А204, А211) / r/g 9121
  • Ultrasound 2 – Data Export
  • Ocular Health – Cardiac and Blood Pressure Operations (Subject)
  • Ocular Health – Cardiac and Blood Pressure Operations (Operator)
  • IMS Tagup (S-band)
  • Ocular Health – Preparation Steps
  • Ocular Health – Cardiac and Blood Pressure Operations (Subject)
  • Ocular Health – Cardiac and Blood Pressure Operations (Operator)
  • FIR Rack Doors Open
  • ACE-H1. Sample Changeout
  • Ocular Health – Closeout ops
  • Replacement of РТ-50-1М No.4 and No.11 (А204, А211) / r/g 9121
  • Ocular Health – Data Export
  • FIR Rack Door Close
  • IMS Delta File Prep
  • IMS and Stowage Conference [Aborted]
  • OBT – Dragon Robotics Review
  • Replacement of РТ-50-1М No.4 and No.11 (А204, А211)
  • USND2 – Deactivation of Ultrasound Hardware and Camcorder
  • MRM1 Fan Screen Cleaning (group B). Cleaning behind panels 405, 406 r/g 8393
  • Mating РТ-50-1М TLM Connectors to БКС / r/g 9121
  • Replacement of РТ-50-1М No.4 and No.11 (А204, А211) – Closeout Ops / r/g 9121

Completed Task List Items

  • None

Ground Activities
All activities were completed unless otherwise noted.

  • Ocular Health ops
  • Robotics training

Three-Day Look Ahead:

  • Saturday, 06/20: Crew off duty, housekeeping
  • Sunday, 06/21: Crew off duty
  • Monday, 06/22: Dragon OBT, CUCU/CCP checkout, OBT emergency drill

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Shutdown

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Standby

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full Up