Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from February 2015

View All Posts

    ISS Daily Summary Report – 02/27/15

    NanoRack Cubesat Deployer (NRCSD) Operations:  The ground started a series of deployments of CubeSats from the NRCSD via the Japanese Experiment Module (JEM) Remote Manipulator System (JEMRMS).  The NRCSD is installed on top of the Multi-Purpose Experiment Platform (MPEP) and was taken outside through the JEM Airlock (JEMAL) via the slide table. The JEMRMS grappled …

    Read Full Post

    ISS Daily Summary Report – 02/26/15

    Post Extravehicular Activity (EVA) 30 Activities:  All 3 USOS crew members participated in an EVA debrief to discuss yesterday’s EVA. Wilmore and Virts completed routine post EVA medical exams. EVA 31 Tool Configuration:  Wilmore and Virts started configuring tools in preparation for EVA 31 planned for this Sunday, March 1st. Japanese Experiment Module Airlock (JEMAL) …

    Read Full Post

    ISS Daily Summary Report – 02/25/15

    Extravehicular Activity (EVA) 30:  Wilmore and Virts egressed the airlock at 5:51am CST. During the 6 hour, 43 minute EVA they accomplished the following objectives: Removed Pressurized Mating Adapter (PMA)-2 Cover Completed routing of cables associated with International Docking Adapter (IDA)-1 Lubricated Space Station Remote Manipulator System (SSRMS) Latching End Effector (LEE) A (Ball screws …

    Read Full Post

    ISS Daily Summary Report – 02/24/15

    Extravehicular Activity (EVA) #30 Preparation:  The USOS crew members made final preparations for the tomorrow’s EVA.  Today, they reviewed the detailed EVA timeline and translation paths, completed an EVA tool audit, and configured the equipment lock. Tomorrow’s EVA will complete the IDA-1 cable installation and accomplish Space Station Remote Manipulator System (SSRMS) Latching End Effector …

    Read Full Post

    ISS Daily Summary Report – 02/23/15

    Drain Brain:  Cristoforetti set up the Human Research Facility (HRF) Pulmonary Function System (PFS) and initiated hardware warm-up in support of Drain Brain Plethysmography measurement.  The crew verified the Ultrasound 2 and Video Power Converter configuration, set up a video camera and performed an ultrasound scan with guidance from the Drain Brain ground team.  On …

    Read Full Post

    ISS Daily Summary Report – 02/21/15

    Extravehicular Activity (EVA) 29:  Wilmore and Virts accomplished all International Docking Adapter (IDA) Cable Deploy objectives associated with EVA 29 within a Phased Elapsed Time (PET) of 6 hours 41 minutes.  Cristoforetti and Shkaplerov assisted during suit donning and doffing activities.  Joint Airlock egress took place at 6:45am CST and post EVA ingress and hatch …

    Read Full Post

    ISS Daily Summary Report – 02/19/15

    Extravehicular Activity (EVA) Preparation:  The USOS crew members performed final preparations for the upcoming EVAs.  Today, they reviewed the detailed EVA timeline, briefing package, and crib sheet then completed final tool configuration. In addition, they set up the Equipment Lock, EMUs, and ancillary hardware to support the upcoming EVA. The EVA to install International Docking …

    Read Full Post

    ISS Daily Summary Report – 02/18/15

    NanoRack Cubesat Deployer (NRCSD) Installation: Wilmore installed two sets of NRCSD-Quad units onto the Multipurpose Experiment Platform (MPEP) which is attached to the slide table in the JEM Airlock (JEMAL).  Video and electronic still photos of installation operations were downlinked.  The planned jettison of the16 cubesats are scheduled to begin 27 February.   Electro-Magnetic Levitator …

    Read Full Post

    ISS Daily Summary Report – 02/17/15

    58 Progress (58P) Launch and Dock:  58P successfully launched from the Baikonur Cosmodrome today at 5:00am CST.  The spacecraft then proceeded with a nominal 4 orbit rendezvous with ISS and docked to the Service Module aft port at 10:57am CST. The Progress is delivering a total of 1449 kgs of cargo to the ISS and …

    Read Full Post

    ISS Daily Summary Report – 02/16/15

    Automated Transfer Vehicle (ATV)-5 Undocking:  ATV-5 successfully undocked from the Service Module Aft docking port Saturday, February 14th at 7:42 am CST.  On Sunday, ATV-5 performed its final de-orbit burn prior to destructive reentry, which took place shortly after noon CST. The crew monitored and took photographs of ATV’s departure from ISS and smoke trail …

    Read Full Post