ISS On-Orbit Status Report

ISS Daily Summary Report – 04/22/14

Extravehicular Activity (EVA) #26 Preparation: In preparation for tomorrow’s planned EVA to Remove and Replace (R&R) the failed External (EXT) Multiplexer/Demultiplexer (MDM)2, the crew performed the following tasks:

  • Flight Engineer (FE)-3 Swanson and FE-5 Mastracchio performed final tool configuration.
  • Commander (CDR) Wakata completed a tool audit.
  • Wakata, Swanson and Mastracchio completed Dynamic Onboard Ubiquitous Graphics (DOUG) software review.
  • All 3 crew members reviewed EVA procedures.
  • Wakata completed part 2 of Airlock preparation to support EVA operations.

Hatch opening is scheduled for 8:25am CDT.

NanoRacks BioRacks: Following installation yesterday the ground was unable to receive data from the NanoRacks BioRack. Troubleshooting was unsuccessful and today’s Experiment Container and Controller installation was delayed and Nanoracks Platform-3 was powered off. Swanson performed additional troubleshooting steps this morning with no success. Ground teams are working on a forward plan to recover the BioRack hardware.

T-Cell Finalization: Mastracchio copied and transferred the T-Cell data from the KUBIK-3 to the European Drawer Rack (EDR) laptop. He then disconnected and stowed the KUBIK-3. T-Cell samples will be returned to the ground for analysis on Dragon at the end of the SpaceX-3 mission. T-Cell seeks the cause of a depression in the human immune system while in microgravity. T-cells, a type of white cell, are coated with chemical receptors that must trigger together to activate the body’s immune system properly. T-cells from flight crews and ground volunteers in a range of ages are analyzed to determine changes in protein production and gene response on the ground and in microgravity.

SpaceX (SpX)-3 Status: Dragon systems are nominal. Powered cargo still on board is nominal (General Laboratory Active Cryogenic ISS Experiment Refrigerator [GLACIER], Optical PAyload for Lasercomm Science [OPALS], and High Definition Earth Viewing [HDEV]). Dragon cargo operations are approximately 20% complete.

Today’s Planned Tasks

  • SM ПСС (Caution & Warning Panel) Test [Complete]
  • Laptop RS1(2) Reboot / Onboard Computer System (БВС), [Complete]
  • RSS1,2 Reboot / r/g 1009 [Complete]
  • Daily Planning Conference (S-band) [Complete]
  • Pre-EVA Crew Health Status – Prep [Complete]
  • Final printout of EVA procedures [Complete]
  • GLACIER – Hardware Deployment [Complete]
  • Video Footage of Greetings / r/g 5444 [Complete]
  • Nanoracks/Biorack troubleshooting [Complete]
  • Nanoracks/Biorack install [Aborted]
  • Pre-EVA Crew Health Status – CMO [Complete]
  • Pre-EVA Crew Health Status – Subject [Complete]
  • Dismantle ЛКТ (ТА251М1Б) and ПЗУ in ТГК 421 [Complete
  • HDPCG. Activation and MELFI Insertion [Complete]
  • EVA Tool Config [Complete]
  • Study of veins in lower extremities r/g 5437 [Complete]
  • On MCC GO Urine Transfer from EDV-U to Progress 421 (AO) Water Tank 1 / r/g 5442 [Complete]
  • MRM2 comm config to support voice comm during the experiment [Complete]
  • Kulonovskiy Kristall Experiment Run r/g 5440 [Complete]
  • EVA Procedure Conference [Complete]
  • Pre-EVA Crew Health Status – CMO [Complete]
  • Pre-EVA Crew Health Status – Subject [Complete]
  • Pre-EVA Crew Health Status Data Entry and Stow [Complete]
  • IMS Update [Complete]
  • DOUG Software Review [Complete]
  • Restore Nominal Comm Configuration [Complete]
  • ТКГ 427 (DC1) Transfers and IMS Ops / ТКГ 427 Cargo Transfers (РПР) + r/g 5317 [Complete]
  • KULONOVSKIY KRISTALL. Copy and Downlink Data via РСПИ / r/g 5440 [Complete]
  • EVA2 Procedure Review [Complete]
  • Gas Analyzer О2 channel adjustment using Analyzer Status Indicator [Complete]
  • ТКГ 421 (AO) Activation, Air Duct Removal / Deactivation/Activation [Complete]
  • СОЖ Maintenance [Complete]
  • EVA Procedure Conference [Complete]
  • PELLE Download & placement before EVA / r/g 5438 [Complete]
  • Connecting HDV Sony HVR-Z7E camcorder and Activation of MPEG2 Multicast TV Signal Monitoring. [Complete]
  • Quick Release Screw Clamps Removal from AO side, Video of the interface [Complete]
  • DCB – Coldbag Unpack [Complete]
  • MICRO7 – Fixation Kit Check [Complete]
  • Cleaning camera digital image sensors. r/g 5439 [Complete]
  • Crew Preference Kit (КСПЭ) hardware Deactivation and closing applications [Complete]
  • Closure of SM Aft – ТКГ 421 Transfer Hatches / Deactivation/Activation [Complete]
  • On MCC GO ПрК-СУ and ТКГ-СУ ТГК 421 (АО) Hatch Leak Check [Complete]
  • Equipment Lock Preparation [Complete]
  • Disconnect Integrated Command and Telemetry System (ЕКТС) АФУ cable from PCE АФУ r/g 5441 [Complete]
  • TCELL. Copying Temperature and Centrifuge Data [Complete]
  • NANO – Module-9 Tube Insertion in CGBA [Complete]
  • EVA Tool Config [Complete]
  • TCELL. Copy KUBIK 3 data files [Complete]
  • Audit of space behind ISS RS panels / r/g 5443 [Complete]
  • EDR KUBIK3 deactivation and stowage after the experiment [Complete]

Task List

  • ARED Cylinder Evac
  • IFM Sabatier purge [Complete]
  • WHC KTO Replace
  • WHC EDV R&R
  • Roscosmos Report
  • Uragan Photo
  • Ekon Photo
  • HMS-OHA test (CDR) [Complete]
  • HMS-OHA test (FE-5)
  • WHC UR/IF R&R
  • No skid tape audit
  • ARED SSCV5 pre-gather
  • Data prep return
  • CSA-CP C/O P2
  • KTO EDV audit
  • MI core return prep [Complete]
  • ST-ISS read
  • XFER Dragon Cargo Ops

Ground

  • Nominal commanding

Three-Day Look Ahead:

  • Wednesday, 04/23: 53P undock, EVA 26
  • Thursday, 04/24: Post EVA 26 cleanup, crew day off
  • Friday, 04/25: 53P redock, MICRO-7, Sprint Ultrasound, Hybrid Training, Skin B

QUICK ISS Status – Environmental Control Group:

Component Status
Elektron Off
Vozdukh Manual
[СКВ] 1 – SM Air Conditioner System (“SKV1”) On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) Off
Carbon Dioxide Removal Assembly (CDRA) Lab Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate
Major Constituent Analyzer (MCA) Lab Stop
Major Constituent Analyzer (MCA) Node 3 Operate
Oxygen Generation Assembly (OGA) Standby
Urine Processing Assembly (UPA) Standby
Trace Contaminant Control System (TCCS) Lab Off
Trace Contaminant Control System (TCCS) Node 3 Full up