Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from April 2014

View All Posts

    ISS Daily Summary Report – 04/30/14

    NanoRacks BioRack Troubleshooting:  Flight Engineer (FE)-3 Swanson inserted BioRack experiment containers and controllers into the BioRack frame. Using the keyboard and Multiple Input, Multiple Output (MIMO) monitor, he commanded the BioRack manually to activate the experiment controllers. Ground teams are still troubleshooting as to why the ground could not command the BioRack frame in Platform …

    Read Full Post

    ISS Daily Summary Report – 04/29/14

    Hybrid Training Part Eleven: Commander (CDR) Wakata donned the Hybrid Training hardware which provides electrical impulses to his non-dominant arm during concentric and eccentric arm motions. The electrical impulses help to simulate the resistance gravity would provide on the ground. This was Wakata’s eleventh of twelve Hybrid Training sessions. Hybrid Training will be used for …

    Read Full Post

    ISS Daily Summary Report – 04/28/14

    Urine Collection: Commander (CDR) Wakata collected urine for his Return-15 day session for the Cardio Ox and Biochemical Profiles investigations. The Biochemical Profile experiment tests blood and urine samples obtained from astronauts before, during, and after spaceflight. Specific proteins and chemicals in the samples are used as biomarkers, or indicators of health. Post-flight analysis yields …

    Read Full Post

    ISS Daily Summary Report – 04/25/14

    53 Progress (53P) Re-dock: On Wednesday, 53P undocked from the Russian Segment Service Module (SM), remained in orbit, then performed a test to re-rendezvous and dock with ISS today which was performed nominally at 7:15am CDT.  The test demonstrated vehicle ability to automatically complete a full rendezvous and docking with the Kurs-NA System. 53P is …

    Read Full Post

    ISS Daily Summary Report – 04/23/14

    Extravehicular Activity (EVA) #26: Today, Mastracchio (EV1) and Swanson (EV2) successfully performed an EVA to remove and replace External (EXT)-2 Multiplexer/Demultiplexer (MDM). Once the MDM was installed, ground teams powered on the new MDM, loaded software, and configured it as a viable backup. The MDM had previously failed on April 11,2014. The EV crew also …

    Read Full Post

    ISS Daily Summary Report – 04/22/14

    Extravehicular Activity (EVA) #26 Preparation: In preparation for tomorrow’s planned EVA to Remove and Replace (R&R) the failed External (EXT) Multiplexer/Demultiplexer (MDM)2, the crew performed the following tasks: Flight Engineer (FE)-3 Swanson and FE-5 Mastracchio performed final tool configuration. Commander (CDR) Wakata completed a tool audit. Wakata, Swanson and Mastracchio completed Dynamic Onboard Ubiquitous Graphics …

    Read Full Post

    ISS Daily Summary Report – 04/21/14

    SpaceX (SpX)-3 Dragon Ingress and Cargo Transfer:  Dragon hatch was opened earlier this morning. The crew began cargo operations by removing the Common Cabin Air Assembly (CCAA) Heat Exchanger  (HX) from the center stack.  Double cold bags were removed ahead of schedule. Dragon unpack continued throughout the day. Hybrid Training Part Eight: Commander (CDR) Wakata …

    Read Full Post

    ISS Daily Summary Report – 04/20/14

    SpaceX (SpX)-3 Dragon Capture/Berth and Ingress:  The crew captured Dragon at 6:14am CDT today.  During the approach, there were some minor Ultra High Frequency (UHF) comm dropouts, but the channel swap-overs were well within Fault Detection Isolation and Recovery (FDIR) time constraints.  Berthing to the Node 2 Nadir port was performed by the ground teams.  …

    Read Full Post

    ISS Daily Summary Report – 04/18/14

    SpaceX (SpX)-3 Launch: SpX-3 launched from Cape Canaveral today at 2:25pm CDT.  After launch there was a delay with pressurization in part of the propulsion system.  Pressurization was completed later and SpX3 is proceeding toward capture on Sunday, April 20, at 6:14am CDT. Hybrid Training Part Seven: Commander (CDR) Wakata donned the Hybrid Training hardware …

    Read Full Post

    ISS Daily Summary Report – 04/17/14

    SpaceX (SpX)-3 Launch/Berth, Extravehicular Activity (EVA) 26 Status: The ISS Program elected to target April 18th and 19th for SpX launch attempts. Teams are evaluating the following options: SpX launch on 4/18, berth on 4/20 and EVA 26 on 4/23 SpX launch on 4/19, EVA 26 on 4/20 and SpX berth on 4/22 Body Measures …

    Read Full Post