Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from August 2013

View All Posts

    ISS Daily Summary Report – 08/05/13

    New Status: H-II Transfer Vehicle 4 (HTV4) Status:  HTV4 launched successfully Saturday August 3rd at 2:48 PM CDT from Tanegashima Space Center, Japan. Capture and berthing are planned for Friday August 9th at 6:30 AM CDT. Over the weekend, Reaction Control System (RCS) and Main Engines thruster testing and leak checks were performed on both …

    Read Full Post

    ISS Daily Summary Report – 08/02/13

    New Status: InSPACE-3 Operations: Flight Engineer (FE)-6 Nyberg performed her first two test sessions of InSPACE-3  today.  InSPACE-3 obtains data on fluids containing ellipsoid-shaped particles that change the physical properties of the fluids in response to magnetic fields.  InSPACE-3 collects and records data on fluids containing ellipsoid-shaped particles that change the physical properties of the …

    Read Full Post

    ISS Daily Summary Report – 08/01/13

    New Status: Multi-Purpose Small Payload Rack (MSPR) Combustion Chamber (CC) Communication Cable Checkout:  Flight Engineer (FE)-3 Cassidy successfully performed activation and checkout of the MSPR CC Communication Cable.  Following this activity, ground specialists initiated steps to verify the video quality downlinked from the G1 camcorder.  Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions (InSPACE)-3 …

    Read Full Post