Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from July 2013

View All Posts

    ISS Daily Summary Report – 07/31/13

    New Status: Ocular Health: The crew continued Ocular Health activities with Flight Engineer (FE)-3 Cassidy acting as Crew Medical Officer (CMO) to  perform ultrasound scans on FE-5 Parmitano and FE-6 Nyberg.  Parmitano and Nyberg also performed cardiac ultrasound scans and blood pressure measurements using the Ocular Health hardware. The cardiac ultrasound aims to obtain vascular …

    Read Full Post

    ISS Daily Summary Report – 07/30/13

    New Status: Japan Aerospace Exploration Agency (JAXA) Layer2 Ethernet Hub and Multiplexer (LEHX) Setup:  Flight Engineer (FE)-3 Cassidy configured the LEHX Hub and a System Laptop Terminal (SLT) with a medium rate data cable to enable communication with the Improved Payload Ethernet Hub Gateway (iPEHG). He set up the SLT to communicate with the Joint …

    Read Full Post

    ISS Daily Summary Report – 07/29/13

    New Status: 52P Launch and Dock: 50P launched at 3:45pm CDT Saturday with nominal ascent. Rendezvous and docking occurred at 9:26pm CDT and were completed successfully in automated mode. H-II Transfer Vehicle (HTV)-4 Rendezvous and Capture On-Board Training (OBT):  Flight Engineer (FE)-3 Cassidy, FE-5 Parmitano, and FE-6 Nyberg conducted proficiency training in preparation for HTV-4 …

    Read Full Post

    ISS Daily Summary Report – 07/26/13

    New Status: Extravehicular Activity (EVA) Mobility Unit (EMU) Troubleshooting: Flight Engineer (FE)-3 Cassidy and FE-6 Nyberg performed a series of EMU troubleshooting steps on EMU 3011 to investigate the likely causes of the water issue experienced by FE-5 Parmitano during EVA 23.  This troubleshooting investigated the functionality of the fan, pump, and water separator.  Additionally, …

    Read Full Post

    ISS Daily Summary Report – 7/25/13

    New Status: 50 Progress (50P) Undocking: The Progress 50P vehicle (M-18M, No. 418) successfully undocked from the ISS Russian Segment Docking Compartment 1 (DC1) nadir docking port at 3:44 pm CDT, after the command to open the vehicle hooks was issued at 3:41 pm CDT.  The separation appeared smooth with no vibrations noted.  Video from …

    Read Full Post

    ISS Daily Status Report – 07/24/13

    New Status: Binary Colloidal Alloy Test (BCAT) Operations: Flight Engineer (FE)-5 Parmitano performed homogenization and took pictures of the ten Slow Growth Sample Module and mixed the contents of samples 1 – 10.  The samples were then restowed.  FE-3 Cassidy homogenized and installed BCAT-3 Sample 5.  This sample had a larger bubble that broke up …

    Read Full Post

    ISS Daily Summary Report – 07/23/13

    New Status: Marangoni-UVP2 Removal: Flight Engineer (FE)-3 Cassidy removed the processed Spatio-temporal Flow Structure in Marangoni Convection (Marangoni-UVP2) from the Fluid Physics Experiment Facility (FPEF) in advance of the installation of the next Marangoni experiment series.  He then proceeded to change out the lamps inside the FPEF and configure for tomorrow’s installation of the Marangoni …

    Read Full Post

    ISS Daily Summary Report – 07/22/13

    New Status: Robonaut Tele-operations: Flight Engineer (FE)-6 Nyberg, in cooperation with the Robonaut Principal Investigator (PI), performed Robonaut Tele-operations today. Nyberg activated Robonaut and the Robonaut Tele-operation System (RTS) which consists of 3D visor, vest and gloves.  These hardware items worn by the operator contain specialized sensors capable of detecting the motion of the operator …

    Read Full Post

    ISS Daily Status Report – 07/19/13

    New Status: 34 Soyuz Emergency Drill: CDR Vinogradov, FE-2 Misurkin, and FE-3 Cassidy participated in Soyuz Descent emergency drill covering the following procedures: Crew responsibilities within the Soyuz Descent operations Communication Soyuz activation Hatch operations and leak checks Suit donning and suit leak checks Descent Module (CA) and Orbital Module (БО) hatch closure and leak …

    Read Full Post

    ISS Daily Summary Report – 07/18/13

    New Status: Multi-Purpose Small Payload Rack (MSPR) Microscope Setup: FE-6 Nyberg assembled the Fluorescence Microscope for installation in the MSPR.  This configuration, along with the leak checks that the crew performed in June are in preparation for the Aniso Tubule experiment launching on HTV-4 in August.  Aniso Tubule will investigate the role of cortical microtubules …

    Read Full Post