Progress Updates
Path to the Pad Articles
› Release and Retract Test Marks Artemis I Mission Milestone
› Orion Stage Adapter Readied for Ride on Artemis I
› Core Stage Removed from Stennis B-2 Test Stand
› Pegasus Barge Leaving Stennis
› Barging In: Artemis I Core Stage Arrives at Kennedy
› Artemis I Core Stage Transported to Its New Home
› NASA Prepares to Stack Moon Rocket’s Core Stage
› Artemis I Orion Moves for Fueling, Next Step in Launch Preparations
Multimedia
› Kennedy Testing for Artemis I
› Playlist of 360 Video
› Crawler Prep for Artemis I
› Underway Recovery Test-9
› Artemis I Orion Lift and Mate to Space Launch System in Vehicle Assembly Building
› Artemis I Orion Transfer from the Launch Abort System Facility (LASF) to the Vehicle Assembly Building (VAB)
› Artemis I Orion Stage Adapter (OSA) Stacking
› Artemis I Umbilical Release and Retract Test
› Artemis I OSA CubeSats
› Orion Launch Abort System (LAS) Integration
› Launch and Mission Countdown Simulations
› Launch Vehicle Stage Adapter (LVSA) Integration
› Interim Cryogenic Propulsion Stage (ICPS) Integration
› SLS Core Stage Lift/Mate
› SLS Core Stage Arrival at Kennedy
› Drone Video of Core Stage Arrival
› SLS Booster Stacking
› Orion Move to Multi-Payload Processing Facility (MPPF)
› Orion Handover to EGS
› Then and Now: Apollo to Artemis
Animations
› SLS Animation
› Orion Animation
Infographics
› Core Stage 101
› Artemis I RS-25 Engines
› Meet the Rocket
› Vehicle Assembly Building
› Exploration Ground Systems Concept of Operations
› Core Stage Journey to KSC on the Pegasus Barge
› Path to the Pad: NASA Moon Rocket Comes Together for Artemis
Fact Sheets
› Exploration Ground Systems Fact Sheet
› Crawler-Transporter Fact Sheet
› Vehicle Assembly Building
› Mobile Launcher Fact Sheet
› Space Launch System Fact Sheet
› Core Stage Fact Sheet
› Pegasus Barge Fact Sheet
› Orion Fact Sheet