Year-in-Review Snapshots: 2023 “Year that Was”NASA’s Stennis Space Center steadily moved forward in 2023, while positioning itself to go even further in 2024. Check out the “year that was” by looking at 23 snapshots from 2023. NASA conducts the first RS-25 hot fire of 2023 on the Fred Haise Test Stand at NASA Stennis on Feb....Leaders from NASA Stennis visit Jackson, Mississippi, during the annual Stennis Day at the Capitol on Feb. 16. In addition...Joe Schuyler, director of the Engineering and Test Directorate at NASA Stennis, tells students what it is like to live...The JXN United team from Jackson, Mississippi, competes during the FIRST (For the Inspiration and Recognition of Science and Technology)...NASA Stennis Director Dr. Rick Gilbrech speaks to about 150 business and industry leaders from Mississippi and Louisiana during the...NASA Administrator Bill Nelson joins virtually with employees at NASA Stennis on March 30 for a town hall meeting to...NASA Stennis Thad Cochran (B-2) Test Stand Director Ryan Roberts talks with news representatives during Media Day activities at NASA...More than 500 NASA Stennis, NASA Shared Services Center, and NASA contractor employees and family members view an RS-25 hot...NASA conducts the final RS-25 hot fire test of an initial certification series on the Fred Haise Test Stand at...NASA Stennis marks a milestone July 13 with the lift and installation of two large trusses on the Thad Cochran...Miss Mississippi Vivian O’Neal stands atop the Thad Cochran Test Stand at NASA Stennis on July 13. As a representative...Teams lift an interstage simulator – 31 feet in diameter and 176,000 pounds – onto the Thad Cochran (B-2) Test...An image from July 25 shows how NASA instrumentation engineer Tristan Mooney prepares for an RS-25 engine test in the...NASA’s SpaceX Crew-5 astronauts Nicole Mann of NASA and Koichi Wakata of JAXA (Japan Aerospace Exploration Agency) speak to NASA...Crews complete a successful NASA Stennis lock system project on Aug. 3. Final testing of the refurbished gates culminated months...NASA Stennis teamed with Relativity Space on Sept. 7 as the company announced an expansion of site activity, signing a...A pair of umbilical support structures arrive by barge at NASA’s Stennis Space Center on Sept. 26, part of the...NASA Stennis is “pouring” the way to a new chapter in propulsion testing with construction of a 3,600-square-foot concrete pad,...Freddie Douglas, deputy director of the Engineering and Test Directorate at NASA Stennis, speaks to students at U.S. Rep. Bennie...An image shows the cover of the NASA Stennis Strategic Plan for 2024-2028. The plan, released on Nov. 6, outlines...Two children stand with cutouts of the Artemis II crew members during Stennis Day in the Bay activities on Nov....Dawn Davis, chief of Technology Transfer at NASA Stennis, gives a NASA sticker to a young boy during the 50th...NASA conducts the third RS-25 engine hot fire in a critical 12-test certification series on the Fred Haise Test Stand...