Suggested Searches

Construction of the A-2 Test Stand at NASA Stennis

Laying a Foundation

Construction of the A-2 Test Stand at NASA Stennis required digging down some 50 feet with steel beams driven another 95-100 feet to provide a foundation for the massive structure. Crews had to overcome various challenges, including south Mississippi weather conditions.

Image Credit: NASA / Stennis
Download